LACC City Campus Central Plant

Lead mechanical engineer and energy consultant for the upgrade of the central utility plant facility and the infrastructure at the LACC City Campus. The work included a complete infrastructure and energy analysis of the entire campus to respond to the planned campus expansion. Provided complete prime and design services for a new construction and existing retrofit comprising chillers, boilers, thermal energy storage and utility infrastructure. The central plant upgrade was designed in full 3D to ensure a smooth implementation with minimal down time.
[This project was completed under Arup]

details
Sector:Educational
Location:Los Angeles, USA
Date:2014
Team
Architect:tecDESIGN
Design Engineer:Arup
Client:Los angeles Community college District
Achievements
Utility Cost Savings:N/A
Energy Savings:N/A
Carbon Savings:N/A
Green Certificate:N/A
Particulars
Renewable Tech:N/A
Green Features:Optimized Architecture; Advanced building controls; Ultra efficiency HVAC
Modeling Tools:TRACE 700; BIM
Services provided
HVAC systems assessment
Renewable Technologies Feasibility
Life Cycle Economic Evaluation
Sustainable Master-Planning
Energy Modeling & Design Advice
Central Plant Design Optimization
Mechanical Design in 3D with BIM