UCSF Medical Center Chiller Replacement

Lead mechanical engineer and energy consultant for a multi-phased project to replace the Hospital chillers. The project includes a new 600-ton replacement chiller and improvements on system temperature differential and energy efficiency. The space constraints and the complexity of the existing piping required the use of full 3D design of the existing and new layouts to ensure a smooth, clash free transition of the critical system. The highlight of the design is the detailed 4 Steps approach of the design to ensure a close to null down-time of the system without the use of expensive temporary cooling equipment.
[This project was completed under Arup]

details
Sector:Healthcare
Location:San Francisco, USA
Date:2010
Team
Architect:The Design Partnership
Design Engineer:Arup
Client:UCSF
Achievements
Utility Cost Savings:$ 1,300,000
Energy Savings:19,000 MWh
Carbon Savings:3,628 T/year
Green Certificate:N/A
Particulars
Renewable Tech:N/A
Green Features:Advanced building controls; Optimized HVAC
Modeling Tools:TRACE 700; Custom Tools; BIM
Notable:"2013 Higher Education Energy Efficiency and Sustainability Best Practice Award"
Services provided
HVAC systems assessment
Life Cycle Economic Evaluation
Energy Modeling & Design Advice
Central Plant Design Optimization
Mechanical Design in 3D with BIM
Facility Assessment & Energy Audit
Links
http://www.hconews.com/articles/2013/08/27/ucsf-medical-center-project-earns-energy-efficiency-award