Prime energy consultant performing energy modeling and life cycle cost analysis (LCCA) of multiple design options for the new high-end mall at Topanga Village using EnergyPro to estimate utility costs for each Modeled systems included code minimum DX package, VRV units, Water source heat pumps, evaporatively-aided rooftop package, and water cooled chillers. The LCC analysis accounted for maintenance costs, replacement costs, tenant charges, cost escalations. IN addition, the study considered the feasibility of installing a co-gen plant on-site.
|
|
|||||||||||||||||||||||
|